Atelier
§01 · The platform · app.atelier.inc

You see what we see, in real time.

Every Atelier project runs through one portal — approvals, production milestones, QC evidence, invoices, and freight. Five screens. Zero email threads. This is the walkthrough.

TIME: 3 MNS 05 SCREENS · DEMO DATA Scroll to Explore
Designed for delivery

Every screen, one standard.

Meridian Hotel Furniture · AT-NYC-2026-0114 · Atelier Team · In production — a live project, screen by screen.

A
Project PulseItems, completion, RFIs, days to delivery — verified numbers, never stale.
B
Stage 4 / 9The 9-stage timeline from Inquiry to Delivered — payments release against it.
app.atelier.inc/projects/at-nyc-2026-0114
OverviewApprovalsDocumentsShippingMessages
Search  ⌘K AM

Meridian Hotel Furniture

AT-NYC-2026-0114 · Atelier Team · In production
Items Complete28 / 46
Completion62%
Open RFIs2
Days to Delivery41
Milestone TimelineStage 4 / 9 · In Production
Inquiry
Contract Signed
Shop Drawings + Sampling
In Production
Production Complete
QA Review
Pre-Shipping & Crating
Shipped
Delivered
Needs your attention
ReviewShop drawings — Guest room casegoods
Jul 21Prototype review — Nightstand NS-01
Fig. 3.01 — Overview · demo data[0.1] — 0.2 — 0.3 — 0.4 — 0.5

Project Pulse. Four numbers that never go stale, a nine-stage milestone timeline, and a rail of everything waiting on you. The state of the whole project in one glance — from anywhere.

app.atelier.inc/projects/at-nyc-2026-0114/approvals
OverviewApprovalsDocumentsShippingMessages
Search  ⌘K AM

Approvals

Meridian Hotel Furniture · AT-NYC-2026-0114
Awaiting your review
Rev BShop drawings — Guest room casegoods12 sheets · uploaded by Atelier Team
SampleFinish sample — Walnut, hand-rubbed oilPhotographed · 3 angles
Jul 21Prototype — Nightstand NS-01Review scheduled
Resolved
Jun 30Brass pull — satin finishApproved by A. Meridian
Fig. 3.02 — Approvals · demo data0.1 — [0.2] — 0.3 — 0.4 — 0.5

Approve at app.atelier.inc. Shop drawings, samples, and prototypes land in your portal. Approve from your phone, mark up to resolution, and release production against a milestone schedule you can see.

C
QC evidenceEvery piece 3D-scanned against the approved model — verified to ±1/64″ before it ships.
app.atelier.inc/projects/at-nyc-2026-0114/documents
OverviewApprovalsDocumentsShippingMessages
Search  ⌘K AM

Documents & QC

Meridian Hotel Furniture · AT-NYC-2026-0114
Project documents
PDFMillwork drawing set — Rev C42 sheets · parsedParsed
XLSXFF&E schedule38 line itemsParsed
PDFFinish spec bookMaterials matched to libraryIn review
QC · current stage
DoneMaterials sourced & cut — 212 pieces
DoneAssembly & finishing underway
Live3D scan QC — 198 / 212 passed gateThe Atelier Standard · ±1/64″
Fig. 3.03 — Documents & QC · demo data0.1 — 0.2 — [0.3] — 0.4 — 0.5

QC · 3D scan. Every piece is 3D-scanned against the approved model and signed off before it ships — The Atelier Standard, verified to ±1/64″. The inspection record appears the moment it exists.

app.atelier.inc/projects/at-nyc-2026-0114/shipping
OverviewApprovalsDocumentsShippingMessages
Search  ⌘K AM

Shipping

Meridian Hotel Furniture · AT-NYC-2026-0114
Freight & delivery
Aug 01QC passed & released to ship — 212 pieces
Aug 04Crated & consolidated — 18 crates
On timeIn transit — consolidated freight, ETA Aug 20
Aug 22Delivery & install — NY 10013
Consolidated shipment
Shipment AT-FRT-0114 · 18 cratesOne consolidated delivery · tracked liveIn transit
White-glove install crewScheduled · Aug 22, 8:00Scheduled
Fig. 3.04 — Shipping · demo data0.1 — 0.2 — 0.3 — [0.4] — 0.5

Shipping & delivery tracking. Finished work is crated into one delivery. Carrier, ETA, and install milestones post to your portal in real time — you know where every crate is until it's in the room.

app.atelier.inc/projects/at-nyc-2026-0114/messages
OverviewApprovalsDocumentsShippingMessages
Search  ⌘K AM

Messages

Meridian Hotel Furniture · Atelier Team
Thread — Atelier Team
Jul 09Atelier Team — Rev B shop drawings are up for the guest room casegoods. Two details changed at the drawer reveal; both flagged in the set.Attached: Guest-room-casegoods-RevB.pdf · 12 sheets
Jul 10A. Meridian — Reviewing today. Can the walnut sample ship to the site office instead of HQ?Read · 9:41 AM
Jul 10Atelier Team — Done — re-routed to NY 10013, arriving Thursday. Prototype review for NS-01 stays Jul 21.Delivery updated in Shipping
RFI 07Atelier Team — RFI: confirm sconce back-plate finish — satin brass per spec book, or match the brass pulls?Response required · blocks lighting release
Fig. 3.05 — Messages · demo data0.1 — 0.2 — 0.3 — 0.4 — [0.5]

One thread, on the record. Questions, RFIs, and decisions live next to the work they refer to — every answer becomes part of the project record automatically.

§02 · In motionwalkthrough · demo data
Fig. 3.06 — portal in motion

Portal capabilities

what ships with every project
01Approvals — drawings, samples, prototypes in one queue
02Production — milestone tracking, PO to install
03QC — 3D-scan evidence, piece by piece
04Freight — consolidated delivery, tracked live
05Invoices — released against verified progress
Start

Send the drawing set. Get one number back.

Get a Quote
Clients

Already building with us? Your project is live in the portal.

Login